01Industries

02
Contractors
Construction companies and general contractors
Those who build have to evidence changes, check invoices and prove safety – often for several sites at once.
Matching modules
A working day with AIDA
Construction project manager, new logistics centre
- The Command Center shows: the notice deadline for a change ends in ten days.
- In the site diary, three disruptions from recent weeks are flagged as possible change events.
- A claim for soil replacement has been approved internally and submitted; a second is a draft with evidence.
- The subcontractor invoice has been checked – nothing unusual.
Fictional example from the demo environment

03
Planners& Engineers
Planning and engineering firms
Those who plan and submit need complete documents, a view of deadlines and conditions – and the current state of the standards.
Matching modules
A working day with AIDA
Civil engineer, office refurbishment in the permit phase
- The case is created from a template; the checklist shows which documents are still missing.
- Before submission AIDA checks completeness; internal approval is requested.
- A new edition has been recorded for an assigned standard – the project comes up for review.
Fictional example from the demo environment

04
Manufacturing
Industrial companies and manufacturing
Those who manufacture need to know quickly which parts are affected when a defect appears – and whether the measurement behind it was valid.
Matching modules
A working day with AIDA
Head of quality management, plant with series production
- The feed reports: three quality cases involve the same component group.
- The trace of the purchased batch separates confirmed from possible impact; the batch is blocked.
- An instrument was not validly calibrated for a documented inspection – the inspection is repeated.
- A recall case is under assessment; the impact analysis is available.
Fictional example from the demo environment

05
Maintenance& Energy
Maintenance and energy
Those who run equipment want to see failures, spare parts and load peaks in context – not in three lists.
Matching modules
A working day with AIDA
Head of maintenance, plant with a press line
- The asset record shows: the same failure mode three times in 60 days.
- The open work order is waiting for a seal kit; stock is below the minimum, the purchase order is under way.
- The press line's meter reports anomalies in the nights after the failures.
- At the main meter, the Monday peaks are above the configured threshold.
Fictional example from the demo environment

See AIDAat Work
We set up the modules that fit your projects and equipment – and support your start along your own questions.